Applied Hydropovver Engineering - İbrahim Gürer - Nobel Akademik Yayıncılık
Hiç mesaj bulunmadı
Taksit | Tutar | Toplam |
---|---|---|
Tek Çekim | 450.00 TL | 450.00 TL |
2 Taksit | 225.00 TL | 450.00 TL |
3 Taksit | 159.00 TL | 477.00 TL |
4 Taksit | 120.38 TL | 481.50 TL |
5 Taksit | 97.20 TL | 486.00 TL |
6 Taksit | 81.75 TL | 490.50 TL |
Taksit | Tutar | Toplam |
---|---|---|
Tek Çekim | 450.00 TL | 450.00 TL |
2 Taksit | 225.00 TL | 450.00 TL |
Taksit | Tutar | Toplam |
---|---|---|
Tek Çekim | 450.00 TL | 450.00 TL |
2 Taksit | 225.00 TL | 450.00 TL |
Taksit | Tutar | Toplam |
---|---|---|
Tek Çekim | 450.00 TL | 450.00 TL |
2 Taksit | 225.00 TL | 450.00 TL |
3 Taksit | 156.00 TL | 468.00 TL |
4 Taksit | 118.13 TL | 472.50 TL |
5 Taksit | 95.40 TL | 477.00 TL |
6 Taksit | 80.25 TL | 481.50 TL |
Taksit | Tutar | Toplam |
---|---|---|
Tek Çekim | 450.00 TL | 450.00 TL |
2 Taksit | 225.00 TL | 450.00 TL |
3 Taksit | 157.50 TL | 472.50 TL |
4 Taksit | 119.25 TL | 477.00 TL |
Ödeme Türü | Toplam Tutar |
---|---|
Diğer Kredi Kartları | 450.00 TL |
Havale / Eft | 450.00 TL |
Posta Çeki | 450.00 TL |
Kapıda Ödeme | 465.00 TL |
Kapıda ödemeli siparişlerde +15,00TL kapıda ödeme hizmet bedeli ilave edilir. |
- Vade farksız taksitler KOYU renkte gösterilmektedir.
- X+X şeklinde belritilen taksitler (Örneğin: 2+3) 2 taksit olarak işleme alınmakta ancak ilgili bankanın kampanyası dahilinde 2 taksit üzerinden işlem yapıldığı halde 2+3 yani 5 taksit olarak kartınıza ve ödemenize yansımaktadır. (2 taksit seçilmiş olsa bile banka kampanyası dahilinde ekstradan vade farkı eklenmeden işlem 5 taksite bölünmektedir.)
Applied Hydropovver Engineering - İbrahim Gürer - Nobel Akademik Yayıncılık
Hydropower being a renewable and clean energy has an important aspect for the future energy demand in the world. In Turkey, as the urbanization and industrialization increase parallel to the increase in population there will be more and more need for electric energy in future. For the development of a hydropower project some diagnostic and feasibility studies are required. There are technical and environmental objectives that must be satisfied for each project. The size of a hydropower project should be decided according to the local hydrological resources. A well designed installation can satisfy many demands under acceptable financial and environmental conditions besides technical issues.
In this book, a wide ranges of topics are covered. They include the evaluation of water resources with their viability, local conditions for fixing the type of system, theory for engineering works, economic constrains and the elements of a feasibility study, environmental impact and appropriate countermeasures, and the selection of turbines to suit various discharges and heads.
This book has been prepared for civil engineering students who take the hydropower course during undergraduate and graduate education (studies). Many solved examples are provided for better understanding the theoretical parts. There are various problems given at the end of each chapter to be solved by students as homework or to check their knowledge about the theoretical explanation given in the book.